Give a brief account of the Tehri Hydroelectric Scheme.

Points to Remember:

  • Location: Tehri Dam, Uttarakhand, India
  • Purpose: Hydroelectric power generation
  • Environmental and social impacts: Displacement, ecological changes
  • Benefits: Power generation, irrigation, flood control (to a limited extent)
  • Challenges: Sedimentation, environmental concerns, resettlement issues

Introduction:

The Tehri Hydroelectric Scheme is a large hydroelectric power project located on the Bhagirathi River in Uttarakhand, India. The project’s centerpiece is the Tehri Dam, one of the tallest dams in the world. Construction began in 1978 and the first power unit became operational in 2006. The scheme aims to generate significant hydroelectric power for the region and beyond, contributing to India’s energy needs. However, its implementation has been fraught with controversy due to its substantial environmental and social impacts.

Body:

1. Project Details and Power Generation:

The Tehri Dam is a rock and earth-fill embankment dam, creating a reservoir with a capacity of approximately 2.25 billion cubic meters. The hydroelectric power station has a total installed capacity of 1000 MW (currently, though initial plans were for 2400 MW), generating electricity through several power units. This power is fed into the national grid, contributing to India’s energy security.

2. Environmental Impacts:

The creation of the Tehri reservoir has resulted in significant ecological changes. The submergence of vast tracts of land has led to the loss of forests, agricultural land, and biodiversity. The reservoir’s impact on the downstream river ecosystem, including changes in water flow, temperature, and sediment transport, has been a subject of considerable concern. Studies have indicated potential impacts on aquatic life and downstream water quality. Sedimentation within the reservoir is also a major ongoing challenge, reducing its storage capacity and lifespan.

3. Social Impacts:

The project’s construction led to the displacement of a large number of people, primarily from villages located in the reservoir’s catchment area. The resettlement and rehabilitation of these displaced communities have been a major challenge, with concerns raised about inadequate compensation, lack of access to basic amenities, and disruption of traditional livelihoods. The project has also raised concerns about the impact on local cultures and traditions.

4. Benefits and Flood Control:

While the environmental and social costs are substantial, the Tehri Hydroelectric Scheme does provide significant benefits. The primary benefit is the generation of hydroelectric power, a cleaner energy source compared to fossil fuels. The reservoir also provides some degree of flood control in the downstream areas, although its effectiveness in mitigating major floods is debated. Irrigation benefits are also claimed, though the extent of these benefits remains a subject of discussion.

Conclusion:

The Tehri Hydroelectric Scheme exemplifies the complex trade-offs involved in large-scale infrastructure projects. While it contributes significantly to India’s energy needs and offers some flood control benefits, its environmental and social costs are substantial. The project highlights the need for more comprehensive environmental impact assessments, robust resettlement and rehabilitation plans, and greater participation of affected communities in the planning and implementation of such projects. Moving forward, India needs to prioritize sustainable development approaches that balance energy needs with environmental protection and social justice. Future hydroelectric projects should incorporate advanced technologies to mitigate environmental impacts and ensure equitable resettlement and rehabilitation of affected populations, upholding constitutional values of justice and equality. A holistic approach, considering the long-term ecological and social consequences, is crucial for responsible development.